The contractor will close off foot traffic to the area highlighted in red below between 8am and 1pm 4/6/23. This area abuts the final stages of active demolition for 268R Powderhouse. The contractor is shutting down access to this portion of the sidewalk as an extra precaution. The area will be taped off off and staff from the construction crew will be staffed at the location of the detours to assist any resident who may need assistance.